Procurement opportunities
Verified needs from Saudi and GCC buyers, giga-project developers and EPC contractors. Buyer names are shared once the Gateway team approves a match.
16 open opportunities
District cooling plant for a coastal resort
Giga-project developer · Tabuk, Saudi Arabia
40,000 refrigeration-ton district cooling plant with thermal storage, built and operated for 20 years.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- Red Sea Global
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-31
IoT platform for smart street lighting and parking
Private company · Riyadh, Saudi Arabia
Sensors and software for 12,000 street lights and 3,000 parking bays, integrated with the city operations centre.
- Hub
- HMA EU–GCC Green Business Gateway
- Giga-project or programme
- ROSHN
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- Up to 30%
- Response deadline
- 2026-11-21
AI forecasting for a district cooling network
Private company · Riyadh, Saudi Arabia
Software that forecasts cooling demand and optimises chiller operation; patented forecasting methods preferred.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- ROSHN
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- Not required
- Response deadline
- 2026-11-11
Vertical farming partnership for year-round vegetables
Private company · Jazan, Saudi Arabia
Joint venture or licensing partner to build and operate vertical farms supplying 5,000 tonnes of vegetables per year.
- Hub
- HMA EU–GCC Green Business Gateway
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-21
Electric bus fleet with depot charging
Private company · Abu Dhabi, United Arab Emirates
120 electric city buses with depot chargers, driver training and an eight-year maintenance contract.
- Hub
- HMA EU–GCC Green Business Gateway
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-26
Rooftop solar and smart meters for 40 commercial buildings
Private company · Doha, Qatar
About 6 MWp rooftop PV with smart metering and a performance guarantee for 40 commercial buildings.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- Not required
- Response deadline
- 2026-11-14
Solar-powered water pumping stations
Government entity (ministry, municipality) · Muscat, Oman
35 off-grid pumping stations for rural water supply, with remote monitoring and local maintenance training.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- Up to 30%
- Response deadline
- 2026-11-26
Smart leak detection for the municipal water network
Government entity (ministry, municipality) · Jeddah, Saudi Arabia
Acoustic and pressure sensors with analytics software to detect and locate leaks across 1,200 km of municipal pipes. Pilot in two districts, then city-wide roll-out.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- Municipal Infra
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-06
Solar-powered desalination units for remote communities
Government entity (ministry, municipality) · Riyadh, Saudi Arabia
Containerised reverse-osmosis units powered by solar PV, 50–200 m³/day each, for remote coastal communities. Operation and maintenance training required.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- NEOM
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-21
Drip irrigation and soil sensors for greenhouse farms
Private company · Al-Qassim, Saudi Arabia
Precision drip irrigation with soil-moisture sensors and a control dashboard for 40 hectares of greenhouses. Water savings target: 35%.
- Hub
- HMA EU–GCC Green Business Gateway
- Minimum TRL
- TRL 7
- Required local content level (LCGPA)
- Not required
- Response deadline
- 2026-11-21
Membrane filtration skids for a seawater desalination EPC package
EPC / Tier-1 contractor · Khobar, Saudi Arabia
Subcontracting package within a 120,000 m³/day seawater reverse-osmosis plant: pre-treatment ultrafiltration skids, with commissioning support. Patented European membrane technology preferred.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- Red Sea Global
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- Up to 30%
- Response deadline
- 2026-12-16
Modular green building panels for a workers' village
Giga-project developer · Tabuk, Saudi Arabia
Prefabricated insulated panels for 2,400 housing units, delivered in phases over 24 months, with local assembly near the site.
- Hub
- HMA EU–GCC Green Business Gateway
- Giga-project or programme
- NEOM
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-01
Utility-scale battery storage for a 300 MW solar plant
Giga-project developer · Tabuk, Saudi Arabia
200 MWh battery energy storage system with grid-forming inverters, 15-year service agreement and local technology transfer through a joint venture.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Giga-project or programme
- NEOM
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- Above 50%
- Response deadline
- 2026-12-16
Air-quality monitoring network for Riyadh
Government entity (ministry, municipality) · Riyadh, Saudi Arabia
60 monitoring stations and 400 low-cost sensors with a public data dashboard and five years of maintenance.
- Hub
- HMA EU–GCC Green Business Gateway
- Giga-project or programme
- Municipal Infra
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- Up to 30%
- Response deadline
- 2026-11-16
Organic waste to biogas plant
Government entity (ministry, municipality) · Riyadh, Saudi Arabia
Anaerobic digestion plant for 50,000 tonnes per year of food and green waste, with biogas use on site.
- Hub
- HMA EU–GCC Green Business Gateway
- Giga-project or programme
- Municipal Infra
- Minimum TRL
- TRL 8
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-06
Industrial wastewater treatment and reuse
Government entity (ministry, municipality) · Jubail, Saudi Arabia
Treatment plant for 20,000 m³ per day of industrial wastewater, with treated water reused for cooling towers.
- Hub
- HMA EU–GCC Water & Energy Security Hub
- Minimum TRL
- TRL 9
- Required local content level (LCGPA)
- 30–50%
- Response deadline
- 2026-12-11